CASE STUDY

Centrica Storage

Key Activity

Client

Centrica Storage

Project

Capital Works

Year

2020

Details

A replacement of a 30 inch line all built off site and installed by EPS

A major 30 inch spool ready to be shipped to site at Easington. Planned and executed by EPS this 30 inch spool was fabricated off site and fitted on site within a tight plan, safely and to exacting standards. Part of our continued support to Centrica Storage at Easington.