CASE STUDY

New Freezer Install

Key Activity

Offsite Fabrication and pipework install

Client

Sure Solutions

Project

Live Factory Install

Year

2024

Details

Offsite Fabrication and site pipework install

A new Freezer installed on a live site in South West England.

A large split drum was packaged off site and a complex pipe install undertaken on site to install ammonia glycol and chilled water systems.

The site was 400 miles from our workshop but along with split drum all valve stations, the majority of compressor and header pipework and pumping stations were fabricated in Hull and delivered to site.