CASE STUDY
New Freezer Install
Key Activity
Offsite Fabrication and pipework install
Client
Sure Solutions
Project
Live Factory Install
Year
2024
Key Activity
Offsite Fabrication and pipework install
Client
Sure Solutions
Project
Live Factory Install
Year
2024
Details
Offsite Fabrication and site pipework install
A new Freezer installed on a live site in South West England.
A large split drum was packaged off site and a complex pipe install undertaken on site to install ammonia glycol and chilled water systems.
The site was 400 miles from our workshop but along with split drum all valve stations, the majority of compressor and header pipework and pumping stations were fabricated in Hull and delivered to site.